Construction
The Project for Reconstruction of Bridges (Phase 2)
| Country name | ![]() |
|---|---|
| Kingdom of Bhutan | |
| Area | Southeast Asia / South Asia |
| Construction name | The Project for Reconstruction of Bridges (Phase 2) |
| Year of completion | 2007 |
| Project overview | [Wakleytar Bridge] L=86.00m Structure: Steel langer arch bridge [Tangmachu Bridge] L=70.00m Structure: Steel langer arch bridge [Sunkosh Bridge] L=95.20m Structure: Steel langer arch bridge |
| SDGs | |
| Category | Civil engineering> Bridge |

