Construction
The Project for Reconstruction of Bridges (Phase 2)
Country name | |
---|---|
Kingdom of Bhutan | |
Area | Southeast Asia / South Asia |
Construction name | The Project for Reconstruction of Bridges (Phase 2) |
Year of completion | 2007 |
Project overview | [Wakleytar Bridge] L=86.00m Structure: Steel langer arch bridge [Tangmachu Bridge] L=70.00m Structure: Steel langer arch bridge [Sunkosh Bridge] L=95.20m Structure: Steel langer arch bridge |
SDGs | |
Category | Civil engineering> Bridge |