Works
The Project for Reconstruction of Bridges (Phase 2)
Kingdom of BhutanSoutheast Asia / South Asia BridgesCivil engineering
Gallery
Overview
| Year of Completion | 2007 |
|---|---|
| Overview | [Wakleytar Bridge] L=86.00m Structure: Steel langer arch bridge [Tangmachu Bridge] L=70.00m Structure: Steel langer arch bridge [Sunkosh Bridge] L=95.20m Structure: Steel langer arch bridge |
